What Is Grey Structure? Meaning, Scope & Handover Checklist


Grey structure is the load-bearing shell of a house foundation, RCC frame, walls, roof slab. See what's included, what's not, and cost share..
Grey structure is the complete load-bearing shell of a house before any finishing work starts. In Urdu it is called khaka or dhancha.
It covers the foundation, RCC frame, brick walls, roof slabs, plaster, and embedded service sleeves. It does not cover paint, tiles, doors, windows, fixtures, wiring, or plumbing fittings.
The name comes from the colour of the exposed shell. Concrete, raw brickwork, and cement plaster all read as grey.
Once paint, tiles, and joinery begin, the grey disappears. The house has then moved from “grey” to “finished”.
A standard grey structure scope in Pakistan covers four groups of work. Each group has items that appear in almost every builder contract.
This is where most first-time homeowners misread their builder contract. The items below are finishing scope.
They appear in a separate finishing quotation, not in the grey structure quote.
Elegant’s scope rule: We lay the empty conduits and pipe sleeves during grey structure. Wiring, cabling, taps, and fittings sit inside the finishing scope. Some contractors bundle a “starter electrical” into grey structure. Ask them for the exclusion list in writing before you sign.
These three terms often get mixed up on site. Here is how they differ in Pakistani construction practice.
| Aspect | Grey structure | Finishing | Bare shell |
|---|---|---|---|
| What it covers | Load-bearing shell, plaster, and embedded sleeves | Everything after grey structure: floors, paint, joinery, fixtures | Grey structure without internal walls or internal plaster |
| Typical use | Residential houses across Pakistan | Follow-on scope after grey structure sign-off | Commercial spaces that a tenant will fit out |
| Move-in ready | No, habitable but unfurnished | Yes, ready to live in | No, often no floors or ceilings |
| Share of total cost | 55 to 65 percent | 35 to 45 percent | 40 to 50 percent of a full-finish build |
In Pakistani practice, grey structure is not only a build stage. It is also a common contract scope.
Many homeowners hire one contractor for grey structure and another for finishing. When you sign a grey structure contract, you agree on three things at once.
The contract must list every item that is included and every item that is excluded. Ask for the exclusion list inside the same document, not in a separate email.
A with-material contract means the builder supplies cement, steel, bricks, and sand at a per-square-foot rate. A labour-rate contract means you buy the materials yourself and pay only for workmanship.
With-material is faster to run. Labour-rate gives you tighter control over quality but takes more of your time.
Every contract needs a clear checklist that confirms grey structure is complete. The finishing contractor can then start against the same checklist. The full checklist is in the next section.
For a typical residential build in Islamabad or Rawalpindi, grey structure runs at 55 to 65 percent of total construction cost. The remaining 35 to 45 percent goes to finishing.
A rough split of the grey structure share by trade:
| Trade | Share of grey structure | What drives the cost |
|---|---|---|
| RCC (concrete, steel, shuttering) | 35 to 40 percent | Cement grade, steel weight per sq ft, ready-mix or site-mix |
| Brickwork and plaster | 15 to 20 percent | Brick class, plaster thickness, total wall count |
| Foundation and excavation | 10 to 12 percent | Soil type, foundation depth, water-table level |
| Embedded conduits and sleeves | 4 to 6 percent | Number of points and consultant scope |
| Boundary wall, water tank, external works | 8 to 10 percent | Plot size, boundary length, tank capacity |
| Supervision, site setup, contingency | 15 to 20 percent | Site distance, project duration, monsoon exposure |
For plot-size numbers such as 5 marla, 7 marla, 10 marla, and 1 kanal, see our guide on grey structure cost in Pakistan.
Your grey structure is not finished the day the roof is cast. It is finished only when every item below is true.
Use this as your handover checklist before you pay the final instalment.
A signed handover note against this checklist protects both parties. It also gives the finishing contractor a clean scope to start against.
If you are planning a build in Islamabad, Rawalpindi, or the nearby societies, a scoping call costs nothing. It saves months of contract renegotiation later.
Our engineering team walks first-time homeowners through the exact scope boundary before any quotation goes out. See our grey structure construction w service for scope, pricing bands, and contract options.
The definition is the same across cities. The specifications and approvals differ. Islamabad and Rawalpindi builds must comply with CDA, DHA, or Bahria Town drawings. Each society issues a commencement NOC before excavation can start. Lahore-region builds follow LDA or private-society rules.
Not really. There are no doors, windows, floors, sanitary fittings, or wiring inside. Some overseas homeowners leave a house at grey structure for six to twelve months while they plan finishing. That is safe once the roof waterproofing is done.
A 5 marla house in Islamabad or Rawalpindi reaches grey structure in about 4 to 6 months. A 10 marla or 1 kanal double-storey house takes 7 to 10 months. Monsoon between July and September can add 3 to 6 weeks. Site management during monsoon is the main variable.
Khaka (خاکہ) or dhancha (ڈھانچہ). Both words mean framework or skeleton. You will hear both terms on site and in builder quotations.
No. Bare shell is a commercial-space term. It is a grey structure with no internal walls and often no internal plaster. The tenant plans the layout themselves. A residential grey structure already has all internal partition walls built and plastered.
Both models work. A turnkey contract with one contractor is easier to coordinate. A split contract with a separate finishing contractor gives you tighter cost control. Finishing is where most cost overruns happen, so this matters.